How to choose a charger pcba processing factory

2021-10-30
View:579
Author:Downs

Charger PCBA processing

Charger PCBA processing needs to provide information

1. Complete PCB board-making documents (Gerber files, placement diagrams, steel mesh files) and board-making requirements;

2. Complete BOM (including model, brand, package, description, etc.);

3. PCBA assembly drawing.

Charger PCBA processing service process

1. Customer orders

Customers of charger products place orders with PCBA processing plants according to their actual needs and put forward specific requirements. The processing plant will evaluate its own capabilities to see if it can complete the order. If the manufacturer determines that it can complete the order within the expected time, then the two parties will negotiate to determine the production details.

2. Customers provide production materials

After the customer of the charger product decides to place an order, they provide a series of documents and lists to the PCBA processing factory, such as the PCB electronic files, coordinate files, and BOM lists required for production, which must be provided.

3. Procurement of raw materials

pcb board

The PCBA processing plant purchases relevant raw materials from the designated supplier according to the documents provided by the customer of the charger product.

4. Incoming Material Inspection

Before PCBA processing, all raw materials to be used are subjected to strict quality inspection to ensure that they are qualified and put into production.

5. PCBA production

During PCBA processing, in order to ensure the quality of production, whether it is patch or solder production, manufacturers need to strictly control the furnace temperature.

6. PCBA test

The PCBA processing plant conducts strict product testing, and the PCB boards that pass the test are delivered to the customer.

7. Packaging after sale

After the PCBA processing is completed, the product is packaged and then delivered to the customer to complete the entire PCBA processing work.

How much does the charger PCBA process cost?

Charger PCBA processing cost = PCB board cost + PCB testing fee + PCB engineering fee (applicable for small batches) + component purchase cost (partially up by 5%) + SMT/DIP welding fee + PCBA testing fee + assembly engineering fee (small batch Applicable) + special packaging and logistics costs (if customer needs).

How long does it take to process the charger PCBA?

Charger PCBA processing time composition: component procurement and PCB production + SMT chip processing + DIP plug-in processing + PCBA testing + finished product assembly.

Charger PCBA processing time details: components and PCB purchases are generally placed at the same time. PCB production takes 3-10 days, and components purchase 2-15. The arrival time of components is relatively uncertain. SMT and DIP need to be added together. 3-5 days, PCBA test generally takes 1-3 days, and finished product assembly 2-5 days.

Choosing a charger PCBA processing factory, the test is to have enough professional knowledge to find a satisfactory factory.

The above is the introduction of how to choose a charger PCBA processing factory.